StatsName: | Göttingen | Type | T/P | Construction Yard (Yard No.) | Arsenal de la Marine, Brest (?) | Launched | 4.8.21 | Commissioned | 1921 | Weight, metric tons | 5014 | Weight, BRT | 4565 | Length, meters | 111,28 | Width, meters | 15,02 | Depth, meters | 5,40 | Engines | Two Rateau Turbines, 2 shafts, 6 boilers | Horsepower, HP | 6400 | Speed, knots | 19 | Range, nautical miles (Max.) | ? at 19 knots using 200t oil | Patients/Medical staff | 458/? | Crew | ? | Armament | None | Owner | Ministère de la Marine Marchande (Cie. Generale Transatlantique),Le Havre |
History- Completed as French T/P Gouverneur Général Grévy;
- 22.12.42 German accommodation ship, Marseille;
- 6.1.43 to Italy: Avezzano;
- 9.43 German;
- On 15.6.44 began conversion to the hospital ship: Göttingen;
- On 17.8.44 released for use as a blockship, still incomplete;
- Scuttled 31.8.44 in Marseille;
- Raised 9.4.45 and was scrapped.
|